INDOT plans overnight lane closures on U.S. 30 for resurfacing project

INDOT plans overnight lane closures on U.S. 30 for resurfacing project

30laneclosure31824webBe prepared for overnight lane closures on U.S. 30 as Milestone Contractors North Inc. completes a resurfacing project for the Indiana Department of Transportation.

The project, which takes place between State Road 55 (Taft Street) and State Road 51 (Grand Boulevard), is expected to start Sunday, March 24, and continue through late November.

Lane closures will be in place during the overnight hours of approximately 8 p.m. to 6 a.m., with alternating intersections closed temporarily when work is occurring in that area. Work will begin on U.S. 30 between State Road 55 (Taft Street) and I-65 through late May, at which point crews will switch to work on U.S. 30 between I-65 and State Road 51 (Grand Boulevard).

Motorists should be prepared for changing traffic patterns through the duration of the project, as overnight lane closures will be set up and taken down each evening. Work will include patching, milling, resurfacing, traffic signal loops and pavement markings. Shoulder work for drainage improvements will take place during daytime hours, but daytime work should not impact traffic.

INDOT encourages drivers to allow extra time when driving through this area and follow traffic directions carefully. Motorists should slow down, exercise caution and drive distraction-free through all work zones.