home         elected officials       departments   events calendar   document center   Contact Us   Site Search  
 
Stormwater Department
------------------------------------

13 W 73rd Ave.
Merrillville, IN 46410
219.769.6784
219.756.8005
8:00am - 4:00pm   M-F
 
 
 
 

Overview

Terminology

Public Education

Public Participation

Illicit discharge

Construction site

Post Construction

Pollution Prevention




 

 
 
 
 MCM 5: Post-Construction Stormwater Management
-------------------------------------------------------------------------------------------------------------------------------- 
 
For the past two decades the rate of land development across the country has been more than two times greater than the rate of population growth. If unchecked, the increased impervious surface associated with this development will increase stormwater volume and degrade water quality, which can harm lakes, rivers, streams, and coastal areas.

The best way to mitigate stormwater impacts from new developments is to use practices to treat, store, and infiltrate runoff onsite before it can affect water bodies downstream. Innovative site designs that reduce imperviousness and smaller-scale low impact development practices dispersed throughout a site are excellent ways to achieve the goals of reducing flows and improving water quality.

Phase II MS4s are required to address post-construction stormwater runoff from new development and redevelopments that disturb one or more acres. This primarily includes developing:

  • Strategies to implement a combination of structural and non-structural BMPs,
  • An ordinance to address post-construction runoff, and
  • A program to ensure adequate long-term operation and maintenance of BMPs.
         
List of Post Constuction BMPs
 
 
 
 
 
home  l  elected officials  l  departments  l  events calendar  l  document center  l  site map  l  contact information          All rights reserved. Town of Merrillville ©2005